Library of Birmingham 伯明翰圖書館

The Library of Birmingham is a public library in Birmingham, England. It is situated on the west side of the city centre at Centenary Square, beside the Birmingham Rep (to which it connects, and with which it shares some facilities) and Baskerville House. Upon opening on 3 September 2013, it replaced Birmingham Central Library. The library, which is estimated to have cost £188.8 million, is viewed by the Birmingham City Council as a flagship project for the city’s redevelopment. It has been described as the largest public library in the United Kingdom, the largest public cultural space in Europe, and the largest regional library in Europe. 2,414,860 million visitors came to the library in 2014 making it the 10th most popular visitor attraction in the UK.

伯明翰圖書館是英格蘭伯明翰的一個公共圖書館。 它位於市中心西側的Centenary Square廣場,旁邊是Birmingham Rep(它與之相連,並與之共享一些設施)和Baskerville House。 在2013年9月3日開放後,它取代了伯明翰中央圖書館。 該圖書館估計耗資1.888億英鎊,被伯明翰市議會視為該市重建的旗艦項目。 它被描述為英國最大的公共圖書館,歐洲最大的公共文化空間,也是歐洲最大的地區圖書館。 2014年有2,414,860,000名訪客來到圖書館,成為英國第10大最受歡迎的旅遊景點。

General information
Type:Public library
Architectural style:Postmodern
High-Tech
Location:Centenary Square
Address:Broad Street
Town or city:Birmingham
Country:United Kingdom
Coordinates:52°28′47″N 1°54′30″WCoordinates: 52°28′47″N 1°54′30″W
Elevation:144 m (472 ft) AOD
Construction started:7 January 2010
Completed:April 2013
Opened:3 September 2013; 5 years ago
Cost:£188.8 million
Client:Birmingham City Council
Owner:Birmingham City Council
Height:60 metres (200 ft)
Technical details
Floor count:10 (OG) 1 (UG)
Floor area:20,798m2 (plus 6,804m2 shared with the REP)
Design and construction
Architect:Francine Houben
Architecture firm:Mecanoo architecten
Structural engineer:Buro Happold
Services engineer:Buro Happold/Capita
Civil engineer:Buro Happold
Main contractor:
Carillion
Capita Symonds (Project Managers)
Awards and prizes:
Architects’ Journal Building of the Year 2013
RIBA West Midlands Regional Awards Building of the Year 2014
2014 Stirling Prize (nominee)
Collection
Items collected:Books, journals, newspapers, magazines, official publications, photographs, BFI Mediatheque, sound and music recordings, maps, postage stamps, prints, drawings, manuscripts and media.
Size :800,000 (Books)
Access and use
Circulation:316,000 (2014)
Other information
Budget:£8.5 million (2015-16)
Director:Brian Gambles
Staff:100 (2015)

一般信息
類型:公共圖書館
建築風格:後現代主義
高科技
地點:百年廣場
地址:Broad Street
城鎮:伯明翰
國家:英國
坐標:52°28’47“N 1°54’30”WCoordinates:52°28’47“N 1°54’30”W
海拔:144米(472英尺)AOD
施工開始:2010年1月7日
完成時間:2013年4月
開業時間:2013年9月3日; 5年前
費用:1.888億英鎊
客戶:伯明翰市議會
所有者:伯明翰市議會
高度:60米(200英尺)
技術細節
樓層數:10(OG)1(UG)
建築面積:20,798平方米(加上與REP分享的6,804平方米)
設計和施工
建築師:Francine Houben
建築公司:Mecanoo architecten
結構工程師:Buro Happold
服務工程師:Buro Happold / Capita
土木工程師:Buro Happold
主承包商:
Carillion市政廳
Capita Symonds(項目經理)
獎項和獎品:
2013年度建築師期刊建築
RIBA西米德蘭茲地區獎2014年度建築獎
2014年斯特林獎(被提名人)
採集
收集的項目:書籍,期刊,報紙,雜誌,官方出版物,照片,BFI Mediatheque,聲音和音樂錄音,地圖,郵票,版畫,圖紙,手稿和媒體。
大小:800,000(書籍)
訪問和使用
發行量:316,000(2014)
其他信息
預算:850萬英鎊(2015-16)
導演:Brian Gambles
員工:100(2015)










Birmingham City Council looked into relocating the library for many years. The original plan was to build a new library in the emerging Eastside district, which had been opened up to the city centre following the demolition of Masshouse Circus. A library was designed by Richard Rogers on a site in the area. However, for financial reasons and reservations about the location this plan was shelved. The Council suggested that the Library be split between a new building built between the Rep Theatre and Baskerville House at Centenary Square, which until 2009 was a public car park (to house the main lending library) and a building at Millennium Point in “Eastside” (to house the archives and special collections).

In August 2006, the Council confirmed the area between the Rep Theatre and Baskerville House as the future site for the library. Capita Symonds had been appointed as Project Managers for the Library of Birmingham. The council’s intention was to create a “world class” landmark civic building in Centenary Square. Not long after this, the two-sites idea was scrapped and the archives and special collections will move to the site at Centenary Square.

After an international design competition, run by the Royal Institute of British Architects, a shortlist of seven architects was announced on 27 March 2008. They were chosen from a list of over 100 architects. The architects chosen were: Foreign Office Architects, Foster and Partners, Hopkins Architects, Mecanoo, OMA, Schmidt hammer lassen and Wilkinson Eyre.

In early August 2008, Mecanoo and multi-discipline engineers, Buro Happold, were announced as the winner of the design competition. More detailed plans for the library were revealed by the council in conjunction with the architects at a launch event held on 2 April 2009.

The previous Central Library failed for the second time to gain status as a listed building. Work was scheduled to begin on demolishing the old library early in 2015 to make way for the redevelopment of Paradise Circus.

伯明翰市議會考慮將圖書館搬遷多年。最初的計劃是在新興的Eastside區建立一個新的圖書館,在拆除Masshouse Circus之後,該圖書館已經向市中心開放。圖書館由理查德羅傑斯在該地區的一個網站上設計。但是,由於經濟原因和對該地點的保留,該計劃被擱置。理事會建議將圖書館分為在Rep劇院和百年廣場Baskerville House之間建造的新建築,直到2009年是一個公共停車場(用於容納主要藉貸圖書館)和位於“Eastside”的千禧點的建築物。 (收藏檔案和特藏)。

2006年8月,理事會確認了Rep劇院和Baskerville House之間的區域作為圖書館的未來場地。 Capita Symonds被任命為伯明翰圖書館的項目經理。該委員會的目的是在百年廣場(Centenary Square)建造一座“世界級”地標公民建築。在此之後不久,這兩個網站的想法被廢棄,檔案和特別收藏品將搬到Centenary Square的網站。

在由英國皇家建築師學會舉辦的國際設計競賽之後,2008年3月27日宣布了七位建築師的候選名單。他們是從100多位建築師的名單中選出的。選擇的建築師是:外國辦公室建築師,福斯特和合夥人,霍普金斯建築師,Mecanoo,OMA,施密特錘拉森和威爾金森艾爾。

2008年8月初,Mecanoo和多學科工程師Buro Happold被宣佈為設計競賽的獲勝者。在2009年4月2日舉​​行的發布會上,理事會與建築師一起揭示了更為詳細的圖書館計劃。

之前的中央圖書館第二次失敗,無法獲得上市建築的地位。計劃於2015年初開始拆除舊圖書館的工作,為天堂馬戲團的重建開闢道路。

Construction

Preparation of the ground for building, and archaeological work between Baskerville House and The Rep had begun before planning permission had been granted. Planning permission was finally granted and approved by Birmingham City Council in December 2009. Building work, which was undertaken by Carillion, commenced in January 2010, with a completion schedule for 3 September 2013.A topping out ceremony to mark the completion of the highest part of the building took place on 14 September 2011.

施工

在獲得規劃許可之前,Baskerville House和The Rep之間的建築和考古工作的準備工作已經開始。 規劃許可最終於2009年12月由伯明翰市議會批准和批准。由Carillion承建的建築工程於2010年1月開始,完工時間表為2013年9月3日。一個頂級儀式標誌著最高部分的完工 該建築物於2011年9月14日進行。

FROM:https://en.wikipedia.org/wiki/Library_of_Birmingham

FROM:Library of Birmingham

FROM:Inside Birmingham Library!

Don’t you think it’s addictive?
Want to know more about the beauty of architecture?
Come and join our members to explore the beauty of architectural design.

覺得看得不過癮嗎?

想要知道更多建築之美嗎?

快來加入我們的會員,一同探索建築設計之美。

The above article is purely for appreciation and sharing purposes, as well as the construction of new technology and the public can be in-depth understanding of the information at the same time there are sources, will be able to query, no use of the document as a commercial transaction, if illegal, please inform the We will immediately remove the site, thank you for cooperation.

以上文章純粹作為欣賞及分享用途,以及將建築新型技術傳遞給與大眾能夠深入了解,同時資料還有來源,將可查詢,絕無使用該文件資料作為商業交易行為,如有違法請務必告知該網站我們將立即處理撤除,謝謝合作。

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

or    

Forgot your details?

Create Account